Triton-Wentworth PGA Championship

Project Type: Event


Project Location: Wentworth, UK


Project Summary: AT-PAC was depended on to provide materials for multiple scaffolds throughout the internationally televised four-day PGA event. The versatility of Ringlock scaffolding was the key to constructing the various structures from small camera towers, and screen supports to larger grids, which used to be the foundation for the corporate and entertaining marquees. Working with Triton made a quick turnaround possible.


Customer Challenges:

  • Due to the PGA's very strict broadcasting schedule any changes or or adjustments to the event had to be made quickly and precisely.
  • Being capable of having quick additions and calculations to the designs because of unforeseen circumstances.


AT-PAC Solution:  The ability to work with Triton to enable quick turnarounds of additional calculations and design as they were required.


Impact: The ability of AT-PAC to quickly assess and adapt to any situation is the ideal way to handle a large event such as a PGA tournament. The Ringlock System's versatility was fundamental in the different sizes and shaped structures needed to keep the event running smoothly.


For scaffolding, rentals get into contact with one of our amazing consultants for more information!!



 




 

Share by: