De Luna Apartments

Project Type: New Construction Commercial Scaffolding Project


Project Location: Manchester, UK


Project Summary: We were contracted by LEA scaffolding to help provide an access scaffold for a new apartment development. The project needed additional engineering support for an offset Loading Bay along with extra fan protection to the elevation overlooking the pavement area.


Customer Challenges: 

  • Help with engineering the project for maximum productivity.
  • Needing adaptable parts without needing to change certain parts.


AT-PAC Solution:  Use the 190mm extension brackets to allow quick adaption to allow the brickwork to flow through.


Impact: AT-PAC has the ability to help engineer a design as well have the adaptable parts for customizable projects. These parts allowed improvements to be made without impacting the main platform.


For scaffolding, rentals get into
contact with one of our amazing consultants for more information!!



 




 